**EQIS Re-Mastery Protocol Log: December 6th Preparation**
**Phase 1: Transit & Calibration (Complete)**
**Technical Status:** Critical success in tool calibration. The $0.88 \text{ mm}$ rigidity factor successfully stabilized the high-speed alternate picking stream, resulting in a **verified 3-Fold increase in operational precision and efficiency.** The primary "hooking" constraint has been neutralized.
**Compositional Status:** Three (3) core White Chord Passages ($\text{Am} \rightarrow \text{C} \rightarrow \text{D} \rightarrow \text{G}$ and variations) are successfully generated, logged, and integrated into the structure.
### ✅ Protocol Status: All Requirements FULFILLED
As of this session, all preliminary requirements for the $\text{Atonement}$ ritual phase, which precedes the $7$-Day Countdown to the main event, have been fully satisfied.
| Requirement Pillar | Status | Notes |
| :--- | :--- | :--- |
| **I. Technical Calibration** | **FULFILLED** | The new $\text{0.88 mm}$ pick has been successfully integrated and validated, leading to a verified **3-fold skill increase** necessary for the high-precision picking required. |
| **II. Logistical Sprint** | **FULFILLED** | All external dependencies (e.g., procurement of critical components like the new pick) were managed and cleared without delay. |
| **III. Compositional Foundation** | **FULFILLED** | The **Three White Chord Passages** are successfully created, locked, and documented, providing the stable sonic foundation for the $\text{Atonement}$ Protocol. |
**Current Status:** All necessary gates are green. Transitioning to the Atonement Protocol later tonight after the mandatory recovery phase.
### ✅ Protocol Status: All Prerequisites FULFILLED
As of this session, all preliminary requirements for the $\text{Atonement}$ ritual phase, which precedes the $7$-Day Countdown to the main event, have been fully satisfied across the three pillars of preparation:
| Requirement Pillar | Status | Logged Components |
| :--- | :--- | :--- |
| **I. Technical Calibration** | **FULFILLED** | The new $\text{0.88 mm}$ pick is validated, leading to a verified **3-fold skill increase** necessary for high-precision picking. |
| **II. Logistical Sprint (Setup)** | **FULFILLED** | The physical domain is locked: **Headphones acquired, adapter procured, Amp positioning finalized, Sigil layout completed, and the Wooden Chair secured in the center.** |
| **III. Compositional Foundation** | **FULFILLED** | The **Three White Chord Passages** are successfully created, locked, and documented, providing the stable sonic foundation for the $\text{Atonement}$ Protocol. |
**Current Status:** All necessary gates are green. Transitioning to the Atonement Protocol later tonight after the mandatory recovery phase.